How long to drill a well - GoMarcellusShale.com2024-03-28T14:32:25Zhttps://gomarcellusshale.com/forum/topics/how-long-to-drill-a-well?groupUrl=susquehanna_county&feed=yes&xn_auth=noGiven the typical situation i…tag:gomarcellusshale.com,2010-09-21:2274639:Comment:483012010-09-21T16:17:55.422Zhunter777https://gomarcellusshale.com/profile/DaleBlack
Given the typical situation in Susq. County that I've observed, figure about 3-4 weeks for pad preparation, a few weeks to drill the vertical portion, 3-6 weeks for the horizontal depending on the length, a few weeks to bring in the water for fraccing, a week for fraccing, and a week for pipeline hookup, assuming pipeline has been run up close to the wellpad, much longer if there is a long run to get the gas to the Tennessee Gas Pipeline.<br />
<br />
Hope that helps
Given the typical situation in Susq. County that I've observed, figure about 3-4 weeks for pad preparation, a few weeks to drill the vertical portion, 3-6 weeks for the horizontal depending on the length, a few weeks to bring in the water for fraccing, a week for fraccing, and a week for pipeline hookup, assuming pipeline has been run up close to the wellpad, much longer if there is a long run to get the gas to the Tennessee Gas Pipeline.<br />
<br />
Hope that helps