Ayrview Well
Layer: Trenton Black River
Driller: Chesapeake
West Township in Section #27
Well # 34-029-21702-0000, lateral 5H goes NW from pad
Well Status:
2013-02-12 = Entered into Production (was originally May 10, 2012 !)
2012-xx-xx = Fracked
2012-xx-xx = Drilled
2012-xx-xx = Production Casing Set
2012-xx-xx = Surface Casing Set
2012-xx-xx = Conductor Casing Set
136 ODNR Unit Acres = 1,100' W x 5,518' Production Unit (min)
http://www.dnr.state.oh.us/mineral/oil/MRMImages/17/1/221522.pdf
Well # 34-029-21701-0000, 1H NW from pad
2013-02-12 = Entered into Production
Status = Conductor, Surface & Production Casing Set, Drilled, Waiting to Frack
125 ODNR Unit Acres = 1,100' W x 5,050' Production Unit (min)
http://www.dnr.state.oh.us/mineral/oil/MRMImages/17/1/221517.pdf
Well # 34-029-21697-0000, 3H NW from pad
2013-02-12 = Entered into Production
Status = Conductor, Surface & Production Casing Set, Drilled
141 ODNR Unit Acres = 1,100' W x 5,172' Production Unit (min)
http://www.dnr.state.oh.us/mineral/oil/MRMImages/17/1/221505.pdf
Pad is located here ...
http://maps.google.com/maps?q=40.7443865587285,+-81.0142632438951
East of East Rochester
West of Kensington
North off RT-30
Status: Frack crew on site
last update on Apr 04, 2013 (see BOLD)
Tags:
Who has a guard shack? Nothing so far that I can see at Trebilcock. If they do Trebilcock, they can just take it down the road to Henceroth, then the rumor mill says another one coming not far away further east next to me. Time will tell.
Ken,
I can't find the location that has the Guard Shack or Comm Satellite.
Jarvis has been waiting the longest then Jan Paul.
But as Monty has pointed out - Mahoning County has earthquake "issues".
I drove past the Ayrview well today and ...
the Drill Rig is still up!
Maybe Charles will have new information regarding this post ....
http://gomarcellusshale.com/forum/topics/rig-taken-down-yesterday
where he stated the Ayrview Drill Rig was down ...
Maybe, the Drill Rig was replaced ?
Maybe, the Drill Rig was lowered, repaired and raised up again?
update:
All wells waiting FRACK (may have started by now)
updated Production Unit (min) Dimensions
update: 3H is fracked
update: Well 5H status was reported as "REVISE UNIT".
Meaning the size / shape of the proposed Production Unit has changed ???
update: Well 5H has been Fracked
SAH,
Some estimated an 8' high flame.
Can you confirm.
Permalink Reply by SAH on June 29, 2012 at 10:54am Reasonable estimate. Passed it Thur afternoon, again around 10 pm.
Reports of the well being flared again on Monday morning but not on Tuesday morning.
Was it flared continuously from Friday until Monday?
Sign up for updates on local & national discussions and headlines in the shale industry. Stay informed!
243 members
246 members
125 members
324 members
60 members
218 members
150 members
568 members
418 members
178 members
Stay Connected
Like Us
Follow Us
Subscribe
Join our lists
© 2013 Created by Keith Mauck (Site Publisher).
| h2 | h2 | h2 |
|---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Tools & Apps |
Copyright © 2012 GOMarcellusShale.com
advertisements

