RIFFLE well

Point Pleasant / Utica formation

Driller: Chesaeake

Salem Township in section # 21-15-3

Elkton quadrangle

Purpose: EDPW / OG, drill horizotal well

 

API Well # 34-029-21737-0000, 10H goes SE from the pad

130 ODNR Unit Acres = 1,110' LW x 5,113' L - Production Unit (min)

ODNR Unit Acre drawing

http://www.dnr.state.oh.us/mineral/oil/MRMImages/17/1/224129.pdf

Well Status:

2013-01-03 = Lateral revised

2012-11-02 = Rig is DOWN, waiting to FRACK

2012-10-06 = Rig # 310 onsite and UP

2012-09-18 = Conductor Casing Set, rig down & removed

2012-09-07 = Air Rig onsite setting the Conductor Casing

2012-06-14 = Permit issued, Drill Horizontally

2012-05-31 = Engineers Report

 

Pad is located here:

http://maps.google.com/maps?q=40.847108932786,+-80.8117613874639

North of SR-558 (Teagarden Rd)

East off SR-45 (1/2 mile north of intersection)

Just south of Hart Cemetery entrance

Just North of "Longs" Crossing

 

Pad Status:

2012-08-27 = Pad complete

2012-08-01 = Pad is 50% complete

2012-06-29 = Driveway started ?

2012-05-31 = Engineer's Report

 

Last update: Jan 03, 2013 (see bold)

 

 

Views: 1855

Replies to This Discussion

updated: directions

update: reports of a driveway started at the well site

update: The Pad is 50% completed

update: Link to ODNR Unit Acre Drawing posted

Utica, I am no longer able to access direct links to ODNR Unit Acre Drawings on the ODNR site.  Have they been moved?  I am able to use yours just fine.

Teri,

 I just clicked on the ODNR PDF link in the "Completions" Report for this well

 and the ODNR Unit Acre Drawing appeared for me.

 

 Can you give me a specific well # which has a LINK that is giving you a problem?

 

 I simply, "copy & paste" the ODNR Link to my GoMarcellus message.

 So, I am not sure why the direct ODNR Link would not work for you.

 Try RIGHT CLICKING on the ODNR link and then select "open in new tab".

 

 Do you get an error message or does nothing happen when you click the link?

 

 

Thanks for your assistance, but today it's working fine . . . operator error perhaps?

Drove past there today around 1:45 pm to tke daughter to school at Kent Salem and the gates were open and there looked like a crane on site, then went back around 6pm and looks like they are putting up a rig, not quite sure. Thats what it looked like to me.

Cathleen,

 Looks like an Air Rig to set the Conductor Casing and possibly the Surface Casing.

 

Thanks Utica I knew you would know what it was, hard to see when your driving, and I couldn't tell what it was, just knew they were doing something. Love to read your post's they are very informative,thanks again.

 

Cathleen,

 Typically, this means that the full-sized RTAF Rig ain't far behind. The RTAF Rig will drill and set the smaller Intermediate Casing and then the Production Casing ...

 

Utica I too wish to thank you for the time you put in posting accurate information. When I tell people about this site that I always tell them to look for your memeber name to get the facts about their wells.
Thanks again and know it's not just Cathleen and I that notice what you do, I believe a lot of people click on your posts to see what's new in their area.

RSS

Local Groups




Stay Connected
Like Us

Follow Us

Subscribe

Join our lists

advertisements