PDC permit for Morgan County Center Twp.  on Centerbend Rd.

Well is listed as Palmer44-20

Views: 13720

Replies to This Discussion

Thanks for an update Teri!

I have heard rumors that the core samples results were a little thick but still good. Has anyone else heard anything like this?

An oil engineer just told me it takes up to a month to have it analyzed. He said that they can push it thru faster if they want. 1 month sounds like a long time to me !

From atop the rig...  And from "last night" (yep i'm a night owl).  The tanks have been here awhile, a new one or two every day filling up, the rest on the left side pulled in today...

Yes, thank you for sharing. The pictures are great.

Thanks Teri, that's a lot of hardware.  I bet you have to keep telling yourself "It's only temporary"

I count roughly 25, 500 bbl frac tanks or 12,500 bbls of freshwater capacity. Assuming they use all the water this would be a normal to good size hydraulic frac job to put on a vertical shale well. Looks like Universal Well Services equipment.

Thanks for sharing, Teri!

Why does this well not show up on the ODNR Hoizontal Utica-Point Pleasant Well Map ??

It is only a vertical at this point, I believe. PDC put it in as a test well. They recently ramped up leasing in the area, so they must have liked what they found.

let's hope!!

Yes I do tell myself "it's only temporary" ... it doesn't always work though! ha ha!  The fracking took a little over 2hrs and being raised around running equipment has paid off because I slept right through it that morning.  PDC has been wonderful about dealing with everything. 