Reviewing the recently released released 2nd Qtr production report I see that Halcon's Grenamyer well produce 5,451 bbl of oil and 64,638 Mcf over 85 days.I performed some quick calculations and this type of production would mean an approximate payout of about 5 years.
Then there was the Kibler well in Trumbull County with similar numbers.
Could this be why Halcon suspended operations?
What say you ?
Tags:
Barry,
What have you been drinking, l.o.l. ?
64,000 MCF in 85 days I dont think so maybe 640 MCF WOULD BE MORE LIKE IT and 60 bbl a day of oil is good but that wont last the decline curve is steep in a year the oil will be more like 30 bbl a day and gas production will probably be cut in half taking alot more then 5 years to payout ....maybe 10 if they are lucky
yes I say these are the reasons why HALCON,BP,SHELL,CHK and ENERVEST GOT OUT OR ARE GETTING OUT OF THE NORTHERN UTICA ....and HILLCORP wont be far behind them......seems like Pioneer and Mountaineer have already gave up too.....no new permits in trumball mahoning and the northern half of Columbiana in several months not to mention Ashtabula,Lake or Geuaga
IMHO
Mike,
"...maybe 10 if they are lucky."
The actual length of time wasn't my point. My point was that it appeared that it would take too long to payout to be profitable.
Either way you answered my question, thanks.
Jesse,
Great analogy.
So there may be hope in the future.
Rule of thumb is a two year payout. If it takes longer than that then it really cuts into the IRR (since the first 18-24 months are the strongest) and makes a well much less desirable.
Basic business practice; if you cant make a profit,dont do it!. If they only get their money invested back,then they drilled it for nothing. They need to get their $$ back in 2 years or less so that they can be making mostly profits for the remainder of the wells life. Sounds like 100 B.O.E.a day would not be enough.
Bo,
A friend who works in TX said between 100 -200 bbls depending on gas production and cost of the well.
at todays prices 100boed wholed make me interested enough to keep drilling ...thats 300,000 a mounth plus gas production
Unless it was a $10,000,000 well. In which case 100 bbl/d would be a disaster.
chesepeaks got well cost down to around 5 million dollars and as shallow as the nothern wells are you would never spend 10 million a well ........they drilled one in wetzel county west virginia to a depth of 11,000 feet and didnt spend 10 million dollars
CHK's first well in Mahoning cost $15,000,000. HK's Kibler wells cost $24,000,000 for the two. If it was $8,000,000 you still wouldn't drill it for 100bbl/d.
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com