Information about drilling activity, pipelines, etc. in Millwood Township.

Views: 122365

Replies to This Discussion

Great photo! Thanks for sharing it.

At one time I was told the McClain pad would drill 3 units with maybe 8 total legs drilled. Now, I am not too sure, maybe less than that. We live right across Putney from the pad, the only house on this particular stretch. I cannot verify if one of the new legs permitted is going under us and putting us into a unit that is being drilled, can anyone help me with this ?

They have not released the plat maps for the 5 new laterals yet.

Philip next time you get back here I have a new your planned for you

Like!

This plat map does not have the 1H and 2H laterals on it.

Ive been trying to find out how many acres I have in these units.  Is that plat just for the 7h.  Supposed to be at least forty something but that may have changed . 

i guess once i zoom in i can see where it says proposed 5h,3h going towards the west . So the 2H and 1H should get more of me. Thats weird that they show 2H running north, maybe a mistake,

That is the only plat map that I can find for McClain.  Here is a screen capture of the ODNR well locator:

It looks a good part of your property will be in lateral 1H and 2H.

Here is the Plat map for McClain 1H and 2H:

http://apps.ohiodnr.gov/mineral/oil/MRMImages/17/7/318790.pdf

Awesome thanks Philip. I don't know how you find this stuff.