A well has just been permitted. The horizional well on the proposed map will be within 200 ft of our
property.From looking at other wells in the area there is usually 500Ft on each side of the well.If the well does not run thru our property will we get some type royalities, when the well is drilled and hopefully produces.
Tags:
It depends upon where the lateral starts and ends. The 500 feet is from the lateral not the well pad. Unit next to my farm has six laterals and the pad is 300 feet from my property but I have no acreage in the unit. If the unit was just permitted it will show up on the ODNR web site in couple of months and you can pull up the unit plat.
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com