Any more info on the Hall pad  off of Rt 151  past Bethel Church?

Views: 8275

Replies to This Discussion

there frackingit now .Fields all lit up and compressors are running

Sure wish they would drill the SE   wells

havent heard anything yet about the other four wells .Hopefully it doesnt take them long

Looks like there is a rig back working the Hall Pad. Does anyone know what wells may be drilled or which direction? The only 2 I know are north wells.

There are currently 3 plaques on the sign board at the entrance for well numbers ending in 1H, 3H & 8H. As of this past weekend, ODNR website only shows permits for 1H & 3H which go north/northwest from the pad. 8H which would go south/southeast from the pad must be forthcoming soon. Not sure which well is currently being drilled. The small rig there now is probably drilling the vertical portion of the next well.
1, 3 & 5 go north. 6, 8 & 10 will go south.

Permit issued to Chesapeake on 5/12/2015 for well #6H to the southeast of the pad as per ODNR website tonight.

Have you seen any activity on the pad?

Moving stuff onto the pad now .Have another well permitted to the north too

That is good news,Thanks Gary

Cementing the 6H Production string tonight, then on to the 5H.

 

Just wondering what   production string is? Not very familiar with this term.Thanks

RSS

© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service