what's the going rate for an above ground temporary (3yr) water line easement? This is monroe co, ohio.
Tags:
I got $3 per foot for 6 months. If the line is there over 6 months, I get paid again. Harrison county Oh.
Do they pick up the line between frac jobs? we are told they only pay while the line is down, and it would be picked up and put down again. our concern is lines being layed across hay fields, and lots of traffic in and out to put it down and pick it up over 3 yrs. They could do a lot of damage to hay fields, etc, plus the pipe will be in the way for haymaking.
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com