Can anyone tell me what is the going rate for pipeline right-of-way in N.Armstrong County for 10" or 12" pipeline ??
Also, what is going rate for pad site to put in metering equipment for dumping 10" line into a 20" mainline ??
Tags:
Gerald,
I have been hearing $20-$25 / foot and maybe around $15K for the metering site.
What part of Armstrong County are you speaking about ?
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com