I am the Safety Manager for a successful rig moving company here in Ohio. A standard rig move for a triple rig usually involves 25-30 workers on each location old & new. 12-15 large truck / flat bead trailers. Most rig moves that make 70-80 truck trips. Also here is other equipment on eachlocation including several cranes and other large equipment to move the various rig components around drilling location(s) Additional personnel include safety and operations including the truck pusher on each location.
Tags:
© 2025 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com