Price-Gregory (contractor) has put up signs this morning that Hydro Testing is in progress for the pipeline running from the processing plant on Stateline Road in Springfield Township (Mahoning County) to the plant in Kensington OH (Columbiana County).
Tags:
Had the opportunity to tour part of the pipe line (by invitation). Spoke with a foreman on one of the job sites. Pipeline between the plants is in sections. First section goes from the Hickory Bend cryogenic plant in Springfield township, aka TAR 1, is twenty (20) inches in diameter, is complete and tested. The second section, TAR 2, is actually sixteen (16) inches in diameter (earlier I had thought it was only 12 inches and I have been corrected) and has not made it all the way to Kensington yet. Apparently the machine being used to bore under the Columbiana County Prison is stuck, and has been since 2014-07-28, underneath the jail. The sections of TAR 2 they have been able to complete are being Hydro tested. The current estimation for completion is October 2014, due to the delay with the machine getting stuck.
TAR 1 and TAR 2 make their connection in Salem Township, Columbiana County.
With any luck they can get the machine un-stuck and the pipeline complete before the snow flies.
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com