The starting offer is/was 25.00 per foot with a 5.00 damage and a 5.00 second pipe , what is a realistic fair offer for this row which is a gathering line,?
Tags:
Permalink Reply by jason irvine on June 28, 2014 at 12:58am
© 2025 Created by Keith Mauck (Site Publisher).
Powered by
| h2 | h2 | h2 |
|---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com