in the plug and perf method can the frac set up drill out the plugs or do they set up a small rig to do that for completion?

Views: 139

Reply to This

© 2025   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service