There's a ~20 mile Edgemarc pipeline proposed in Butler County. According to the landman that stopped by my place, the Edgemarc pipeline is going from the processing plant on Hartmann Road in Jackson Township to a tie-in Concord Twp, west of SR 38 and will follow the 138 kV powerline ROW. The landman said that the pipeline was to be located on the edge of the cleared power line ROW. The survey crew came out and put the pipeline centerline stakes ~ 150 feet from the edge of the cleared ROW. The new pipeline is to have a 50 foot ROW. In wooded areas there would be a strip of trees between the new pipeline and the existing electric line. Does anybody know why they are not abutting the cleared powerline right-of-way? Is there a second powerline or pipeline proposed in this area?
Tags:
© 2025 Created by Keith Mauck (Site Publisher).
Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com