Another Solar Boondoggle Ironically Demonstrates Pipeline Need

North Carolina is the proposed site of yet another solar boondoggle requiring both massive subsidies and added natural gas capacity as well as pipelines.

Wilkinson Solar has filed papers requesting permits for a 74-megawatt solar electricity facility about 35 miles east of Greenville, NC. If approved, 288,120 solar panels would blanket 600 acres (0.94 square miles) of now scenic, serene farmland next door to the Terra Ceia Christian School near Morehead City.

The company wants to catch the solar wave, and make a lot of money under “net metering” policies that require payment for electricity added to the grid, whenever it is generated and regardless of whether the electricity is needed at the time. Electricity generated from these new panels would not be sold in the local area; it would be exported to Virginia, Raleigh-Durham and other locations.

Solar power installations doubled in 2016 over 2015, media outlets reported in February. There are now 1.3 million solar installations across the United States, with a cumulative capacity of over 40 gigawatts. That’s enough capacity to power 6,560,000 US households, they say. Of course, there are caveats.

Read more:

http://naturalgasnow.org/electric-vehicles-not-sustainable-without-taxpayer-subsidies-clone/

Views: 13

Comment

You need to be a member of GoMarcellusShale.com to add comments!

Join GoMarcellusShale.com

© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service