I've heard from multiple people that there are problems at the Milton site? Anyone hear anything?
Tags:
Because of confidentiality I cannot tell you how I know that they did a second lateral, but they did. They will likely never make a profit on that well but the data collected will be invaluable.
What can I say, I'm a special guy. I have some deep connections to the industry and I post on here under a pen name. I just participate in this forum because landowners often don't get the best information and it can hurt them. This is potentially the biggest economic windfall for Ohio in decades and I'm just doing my part to make sure that people are armed with good information.
So, you know that the first unsucessful lateral is already paying out royalties?
The easiest way to tell how many laterals were drilled on that site is to look up the permit on the ODNR website under the Oil an gas database. The Milton well is all named under GEATCHES, Buckeye energy, 3 permits = 1 vertical and 2 laterals
thank you for that information.
What I really need to know is if they have to depict the direction of the lateral they are seeking permits for, and if so does that show up anywhere on the permit?
They typically have to record a site map, however, I don't know that those are accessible on the ODNR site but I have seen them in the lease records available through the county recorders office.
Thank you. i know that the first lateral is producing as my neighbors on that lateral have recieved royalty checks already. The second lateral is still being flared and has been burning for over three weeks now. According to Marcus Grayson, that well is not producing. His "inside:" information about the theree wells, one horizontal, two laterals is open knowledge amongst the rest of us in the area, and those smart enough to look it up.
I was told/read that they normally drill NW or SE on the laterals from the well site, as somehow that is how almost all of the deposits run. I personally do not know if that is correct, but hope so as I am directly NW of the well pad.
Brett,
I attached a PDF file with maps and completion data from the Geatches well. The lateral runs NW as you and Marcus had speculated. Worth noting is the completion log with Marcellus thickness @ 44' I would have anticipated it to be a little bit thicker. Take a look at the numbers I marked for the Utica thru BRG. As I started to poke around I noticed the Geatches site only has one active lateral permit. There are actually a number of permits for that site but a portion of them are revisions. As near as I could find there is really only one lateral permitted on that site.
Thank you for that information. They finally stopped the flaring of the second lateral this past weekend, and the flare pipe is gone and has been replaced with a "tree". i am hoping that means it is ready to go into production$$$$$!!!
Considering Chesapeake was in a "test phase" about two weeks ago, I don't think things are that far along, are they? Haven't been there out there in about three weeks, myself.
Corey,
How do you find the well plat map? Is it on the odnr website?
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com