Probably just moving on to the next phase. Do you know what has been done here? My experience is with Chesapeake so it may be a little different. They build the pad ... then leave for a month, many months, only in one case so far forever. This may hold some land by production simply building the pad depending on the lease. Conductor casing being set by a small rig is clue that rig is coming. Rig comes a couple weeks to a month depending on how many laterals they do at one time. Fracking equipment comes for a week or two depending on how many wells were drilled. Pipeline crew comes if no pipeline is available or if they are moving wet gas to a cryogenic facility. Whenever any of the above activities are going on there are lots of people, lots of trucks, signs along the road flaggers etc. Then SILENCE for weeks or months in between these steps. Pipeline work may not be done until several wells can be hooked up at the same time.
Keep in mind that HK's projected drilling program for the Utica/PP was only 10% of their total capex budget. That means no drilling like gangbusters, rather drilling slowly and steadily until they feel comfortable with production forecasts.
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com