Our land is part of the Yost Well which Chesapeake set-up in Franklindale. They told us last March that they are running a pipeline from Canton to Franklindale and would be pumping gas out of the ground within 6-18 months. It is almost month 14, so I was wondering the status of that pipeline. Does anyone have any knowledge of this?
Tags:
There has been a lot of pipeline work going on this spring along the south side of 414 in Franklin and a couple of lines running north towards the Tennessee line from that work. Not sure if the line was intended to extend to Canton, the pipeline maps on the Bradford county website appear to show a break in pipeline development near the east border of LeRoy Looks like lines west of the break are connecting both to the Tennessee line and to another transport line somewhere farther south and west while Franklin just connects to the north. Not sure what situation is north of 414, but from what I see it looks like things are pretty much completed through that stretch, pipes covered and land graded.
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com