And this time, SWEPI did make the deadline.
https://www.paoilandgasreporting.state.pa.us/publicreports/Modules/...
Tags:
Wouldn't have applied to the Neal 815 wells as of the closing date (June 30). According to the numbers they did submit, the permit had expired on the vertical well and "Drilling has not started." on the six horizontal wells. Which is not consistent with the 7/11 SPUD report that the six horizontals were started, one each day, 5/18->5/23. But whichever is correct, it's unlikely there was any production by 6/30.
NGLs are not automatically a positive. Over a certain level, they have to be removed to prevent damage to natural gas pipelines and equipment. But is there going to be enough of it to economically justify the next step of building (or transporting it to) a fractionation plant? What about chemical plants that will use the components as feedstock? If not, it's essentially a waste product.
I did download the "new" numbers and now Talisman is missing. The total TC production is now ~2/3 of what it was reported to be in the 8/17 pdf. So they still don't have it right.
But, thanks for the heads-up.
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com