I have received a proposal to construct a well (or wells) on my property. The well pad is designed to be 400ft by 300 ft. the adjacent tank pad is now designed to be 150ft by 205ft. Are these sizes the real minimum or are they for the logistic convienience of the driller. The well pad width in particular, is a problem for me. I of course would like to reduce both pads to the minimum.
Tags:
Permalink Reply by Billy Park Whyde on June 25, 2013 at 2:35pm I thought the anti fracking type crowd was against mountaintop removal coal mining but yet they never complain about a new Walmart Store in those mountaintop areas.
Jim Pollock replied to Jim Pollock's discussion 'Bright Rock Energy to drill a new well' in the group Columbiana County, OH
Sage59 replied to Rock's discussion 'Any Potential or Known Developments in Trumbull County' in the group Trumbull County, OH
Craig stull replied to Rock's discussion 'Any Potential or Known Developments in Trumbull County' in the group Trumbull County, OH
© 2026 Created by Keith Mauck (Site Publisher).
Powered by
| h2 | h2 | h2 |
|---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com