I am a little confused about the access for pipeline ROW. Do these access roads normally run alongside of the actual ROW when doing the actual trench digging?
On my property that pipeline will have to go right up a very steep pitch. It is not so very long but is timbered. Logging tractors have used it mostly to bring tops and logs down. But to go back up these tractors were allowed to cross on to another person's property to back to the timber and logs. However it was quite a long trip back.
I am presuming they will start from the eastern most well and do the trenching to the west.. Maybe I could convince them to put their access road up that steep pitch at angle across the pitch instead right straight up the hill. That idea would work for me.
Bill Ladd.
Tags:
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com