It's finely going to get hooked up. I am talking about the Bertovic and Cody wells the tree cutting crew is half mile from the two wells. The pipe liners are just behind them by a few days.They crossed middle rd in industry borough and will be y ing off to these wells this week. We can hardly wait, its been a long two years but good things happen to those who wait. The lines are coming off of Deer trails c.c. Going across engle rd to these wells.Hope every body that signed on here is as fortunate as we are. Mtn Jack your friend in the gas field.

Views: 1378

Replies to This Discussion

With the sound pads going up at the Berovich pad, does this mean they are going to do drill the 2nd well? There 2 permits on the board- 6H & 8H.

I can't think of any other reason they would put up the sound walls except for fracing and drilling.

Since this well has been fraced already, it would seem that a rig will be coming soon to drill another.  

They have 30+ drilling permits approved for new wells in the county. The vast majority of them are for 2nd and 3rd wells on most all pads already drilled.  

I wondered how long they could wait before drilling them. I suppose since the gathering lines are now being built out quite quickly we will see things pick up more and more as time goes by.

Well the clearing for the pipe to the Berovic well is about done. Pipe is laying in place down to middle rd. Deer trails c.c. Is where the above clearing has been done, the pipe will y about 600 feet from middle rd and be cleared to the Cody well also. The pipe to the Bertovic we'll is 6 inch and the one to Cody is 10 inch. I think they will clear from the Cody over to oak grove rd and head up to the Brighton twp well on Nevelle rd. It's nice to know they will flip the switch soon. Mtn Jack
Well the pipe lines are about finished, as they are being hydro tested this week. I was told they will use these line to run water first for fracking and what ever, then clean them before the gas. I think the guys have done a great job and the clean up and grass crews are coming in now. Mtn Jack
Yep, the water trucks were lined up this evening. Thanks also for the updates!

The pipeline cut currently extends to from the Cody well to Pine Grove Rd between Doyle and Neville. I drove by this morning and saw an excavator working on the hillside and another being unloaded, don't know if they have been clearing or filling but the cut stops at Pine Grove. For the past 2 weeks there has been increasingly heavy truck activity on Neville Rd going south from Tusca up to the Jenkins pad. I live on Neville and see only empties coming back from the Jenkins pad. Maybe a second drilling is in order. 

Hmmmm, Interesting.  Thanks for the info and keep us up to date with any more news there.

I live on pine grove and have seen a lot of activity lately as well. There are two big white tanks visible from neville road at the jenkins pad. Lots of truck traffic for the gas pipeline and for the pad at jenkins well. No new signs at the jenkins pad or sound walls that I can see. I noticed they do have the right of way almost cleared as of yesterday from jenkins pad across pine grove . Good luck for my neighbors as the unit from jenkins missed me by 800 feet and cody by about the same. Seems like someone is going to a check soon ! Maybe mtn Jack will take me bear hunting ? LMAO

Talked with a guy checking the wells for leaks, he said the bertovic and Cody well are ready for sale. Checks in 3 or 4 months. He said he wasn't sure if our wells were sold to South west or not. He said all of WV is sold and his job is going to transfer to South west. Even the employees are shaken up by The big Cs antics. Hope somebody reins them in. Mtn Jack