Just curious if anybody has seen continued work by Shell at the old Horsehead plant. By the same token, has anybody heard any rumblings as to how things are coming along?
Tags:
Shell reports a third quarter loss of 7.4 billion dollars. They also suspend the Cameron Creek oil sands development in Canada and suspended the Alaksan offshore drilling due to a very disappointing "dry" well.
I take this as a good sign that the Beaver cracker plant will have less projects to compete with internally in the company moving forwards. I just hope financially they are still in good condition to move forwards with this project.
The other development is the merger with the BG Group which is to be completed in early 2016 if things go as planned.
http://www.theguardian.com/business/2015/oct/29/shell-profits-arcti...
Hehe, yes...about a month ago I was told this and I kept my mouth shut 'cause I couldn't find a second source. Now we have two reports, which still means nothing I suppose!
I was told the same about the use of the property, plus the fact that if they buy the Mall property it will no longer be a property open to the public. If it stays open to the public, like a mall, they will have to build a blast wall nearby incase of an explosion at the Cracker plant. So, a large expenditure is done away with.
I don't know how true any of it is.
What I was told is that Shell bought 150 acres between 376 and the mall to put up offices.
Oh come on guys, let's use some common sense.
A blast wall between the mall and the cracker plant? What about the interstate and major river crossing that see over 25,000 vehicles a day? No blast wall to protect those? And the mall is 3/4 of a mile from the interstate, let alone the 350' vertical difference between the site and the mall. How tall of a blast wall would that have to be? 84 lumber and the residential part of Vanport will be closer than the mall, and much more susceptible to a potential blast.
And why would Shell let Columbia Gas and others start building between the mall and the cracker site? Would be a lot cheaper to buy vacant property than to buy buildings that were just built.
But I did hear that they have an agreement to buy the vacant Michael Baker office building on Dutch Ridge Road, just up the interstate. And that I heard from a Baker employee, who is from Allegheny County and doesn't know nor care much about the cracker.
Just saw that there is currently 14,559 views of this thread and that there are currently 226 members of the Beaver County forum. So, if every member of the Beaver County forum viewed this thread 64.42 times then that would add up!
However, most likely, there are A LOT more folks interested in this thread than just us GMS Beaver County forum members...
Oh, and Merry Christmas to everyone! :)
Todd
Merry Christmas, Todd and Beautiful Family !
Merry Christmas, Trapper !
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com