I read in a recent comment that Mark West had finalized plans for the pipeline between the Cadiz industrial park site and the Hopedale fractionator site. I have been unable to find route details. Can anyone provide some input on the general path that the pipeline will follow between the two sites i.e. north or south of route 22 etc.
Tags:
Im not sure of entire route but I do know it crosses rt 250 by fox bottom rd then runs on west side of croskey rd then cuts across croskey rd and across unionvale rd.
It should be generally south of US 22 and crossing 22 somewhere near the Jewett-Scio Exit (St Rt 151) not far from the fractionator. It will cross St Rt 9 near the industrial park road junction and cross US 250 near Co Rd 15 Foxes Bttom Rd
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com