The six-well Alton 2 pad in Upshur County, drilled during the first quarter of 2012, was completed late in the second quarter with 135 stages. Completed lateral lengths ranged from 3,545' (12 stages) to 5,941' (25 stages). All six wells had been turned into production by the end of July with individual well peak 24 hour rates ranging from 3.5 MMcfd to 6.7 MMcfd. These flow rates represented significant improvements over the initial Alton 1 pad, which was drilled and completed in 2011.
http://finance.yahoo.com/news/consol-energy-announces-operational-f...
Tags:
Permalink Reply by Richard Fanelly on October 16, 2012 at 4:39am Thanks for the info.
How might I determine the location of the Alton 2 pad?
Richard Fanelly
The Alton 2 pad is located near Alexander in southeast Upshur.
Permalink Reply by Richard Fanelly on October 16, 2012 at 4:43am Is enuff yet known about the decline curve of typical Marcellus wells to predict a reliable range of total lifetime production?
Richard Fanelly
I'm not sure what type of decline curve, if any, Consol has given for these wells.
Permalink Reply by Richard Fanelly on October 17, 2012 at 3:09am Thanks again for your info.
Richard Fanelly
Permalink Reply by Kyle Nuttall on July 10, 2015 at 4:54am gasoholic, just wondering if you've kept tabs on the Alton pad. Any idea what the production rates are three years in?
© 2025 Created by Keith Mauck (Site Publisher).
Powered by
| h2 | h2 | h2 |
|---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com