Consol Completion Report for the six-well Alton 2 pad in Upshur County

The six-well Alton 2 pad in Upshur County, drilled during the first quarter of 2012, was completed late in the second quarter with 135 stages.  Completed lateral lengths ranged from 3,545' (12 stages) to 5,941' (25 stages).  All six wells had been turned into production by the end of July with individual well peak 24 hour rates ranging from 3.5 MMcfd to 6.7 MMcfd. These flow rates represented significant improvements over the initial Alton 1 pad, which was drilled and completed in 2011.

http://finance.yahoo.com/news/consol-energy-announces-operational-f...

Views: 860

Replies to This Discussion

Thanks for the info.

How might I determine the location of the Alton 2 pad?

Richard Fanelly

The Alton 2 pad is located near Alexander in southeast Upshur.

Is enuff yet known about the decline curve of typical Marcellus wells to predict a reliable range of total lifetime production?

Richard Fanelly

I'm not sure what type of decline curve, if any, Consol has given for these wells.

Thanks again for your info.

Richard Fanelly

gasoholic, just wondering if you've kept tabs on the Alton pad.  Any idea what the production rates are three years in?

RSS

© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service