From what I read on here was 2 NW laterals. They sure are taking their time getting the horizontal permits done unless ODNR are the slow ones. It has been almost 2 months since it showed up on the engineers report and still no permit on ODNR weekly updates.
Heard today that the pad is completed and is waiting on a rig to show up. Also there will be 3 more wells drilled in the area as well.
Looked to be a small rig on the pad tonight or it was a small crane. Could not see it real good through the trees. Should start drilling soon I imagine. The other wells will be the TUSC 7 Hartzler well just down the road from the Beachy pad, the Shrock well will go in on County RD 45 which is called Evans Creek Road , and I heard Putt Farms will get a well drilled towards Sugarcreek.
heard rig coming in a couple weeks. also wondering when cnx will apply for the horizontal permit?
I am thinking they will wait and drill the vertical and examine the cores. Then they will get the plug back to horizontal permit. I cant think of a reason why the permit has not showed up yet other than this. Who knows really what they are doing I can only guess.
Thanks! Keep an eye out for more as this well grows!! I've watched soooo much "well traffic" go by the house the last few days, it seems never ending.
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com