Tags:
Is all the traffic bringing equipment in? I have been wondering if they will start on the hartzler pad right away.
Yes it is equipment. Alot of the heavy equipment traffic can not make the turn it the well road if coming from Ragersville. They go to the next crossroad ( Pleasant Valley and Ragersville Road) to turn around. So that makes for alot of traffic in front of my house.
just checked county engineers list beachy horizonal permits have been applyed for does appear to have 2 separate permits by the gps locations also one listed as tusc8a other listed as tusc 8b acreage at 379 acres im thinking for them to appy for them at the same time rig will drill one right after the other and that they know are our area will be very productive
my nieghbor just called today and said rig was being set up
I'm at work now, so I'll get pictures in the morning!!
The date is wrong on the picture above, it was on September 27.
Sorry my mistake, the Troyer Well is northeast.
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com