Mizer well now has a lot of activity, including a small rig that I believe will drill the conductor hole.
I have a strong feeling that at least some of the OIL WINDOW is now being opened with new completion
methods. This would be GREAT!!!!!!!!!!
The main rig is now being set up, this "oil window" well will be drilled. I hope it's good.
Mizer ODNR Plat Map below.
http://apps.ohiodnr.gov/mineral/oil/MRMImages/17/7/319344.pdf
rig moved off over the weekend supposedly two holes drilled
Nothing new since the rig moved off site. Probably waiting on fracing to take place.
A row of frack tanks was just placed on site and a wireline truck is working inside the well right now. Things are moving right along.
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com