Does anyone know of a link to a website that describes the timelines of other shale plays so that we can maybe get a better idea of how the Utica may play out?
Tags:
i would think that the size of the utica would make it hard to compare. also the bakken is in the middle of nowhere . the developement would be faster there. here we are up to our necks in fracktivists.
The Utica will be slow getting off the ground here as there is simply not enough rigs in the area to drill that fast . Some one the other day posted a rig count in Ohio of like I think it was 21 rigs? If it takes a month each say to drill a unit 8 months in drilling due to load limits = 168 wells. If the process is to speed up someone will need to build some more rigs. Then we have the logistics of building pipelines, compressor stations it will be a while.
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com