I was by this well pad a week ago today and there was a rig present.  Since there are 2 legs in production on this well pad they are drilling at least the 3rd leg if not more.

Views: 4520

Replies to This Discussion

see attached DU's.......not sure which one is correct...south legs seem goofy.

center north 1-33H and center south 5-33H are drilled.

south east 4-33H currently being drilled.

 

Attachments:

Guessing by the date on the maps, I'd say the bottom one is the most current since it's dated in 2013. Looks like the size of the drilling unit  remained the same. I talked with a Gulfport manager last week and he said they wanted to wrap up the boy scout operation before scouts started using the property for the summer. Not sure if he was talking about drilling, or fracking a well.

Randy

the lateral spacing seems very odd.......400' on one, 600' on another, 800' on another and over 1,000' on another.......?.....maybe they are different depths..?

was at the scout pad friday morning........lots of activity....rig is gone....many tankers moving in (presumably water).....frack pumps on pad.

Attachments:

here is a pic of what i heard is a compresser station.......just over the hill on 799.

Attachments:

yesterday - frack pumps gone (a few frack tanks were there).....large grey tanks gone........they were feeding some kind of hose or tubing down the wellbore from a large reel.........also working on some of the "refining" equipment near the 14 big tanks.

also saw a little activity on friday at the scout camp....looks like they are preparing for the season.

yesterday.......rig back up....they must be drilling it out completely.

Attachments:

Maybe they're drilling out the frac plugs.

Randy

i didnt know they drilled out the frac plugs......it seems like a smallish rig so that could be exactly what they are doing.

june 23rd......all mobile equipment gone.....looks like 4 wellheads.

....many tents pitched at the camp.

also there has been a good size crane sitting at the compresser station (or whatever that is) over the hill on 799....and they are seeding the pipeline row.

Attachments:

went by the other day........little activity......the "mini refinery" is painted up nice and a small flare burning........#2 came on line last week....#5 back in june........#1 last November........#5 is center south, #1 is center north and #2 is westside north spaced 800' from #1.........I think #4 eastside south is drilled but I guess not producing yet...according to the map, #4 is spaced 600' from #5.

Attachments:

2013  Q-3 production results for the Boy Scout pad:

well #                     oil                     gas                     days in production

1-33H                13,901 B          117,195                          90

2-33H                41,617 B          135,524                          70

5-33H                 7,995  B              42,675                        90

4-33H                20,770 B              84,672                        65

Randy