FYI
Paige Pad is located on 644 south of Leona Pad / Summitville Ohio but the Polen permits expired 3-7-15 which would have been next one south of Paige. Nothing seen on local gathering pipeline construction.
Tags:
They were hauling stone for Paige last week (2015-03-05). They were traveling in packs of 4-5 trucks at a time. I passed at least 30 trucks (straight trucks with 5-6 axles) loaded with stone on SR644 and US30 in about 1/2 hour time frame. I got stuck in traffic behind a group of 5 trucks that were empty going back for more stone.
For pipeline work in that area try looking at the timber they cut on both sides of SR644 at the junction of SR518. The path of cut timber runs north towards the Kensington plant. It also crosses McKaig Road west of SR644. Timber crews were out doing more cutting on 2015-03-05. Not sure if the clearing is for a gathering line or for the Spectra Energy Pipeline headed down to Monroe County. It would make more sense to connect the Paige Pad to gathering line at the Briceland Trust pad. Less pipe to put in the ground to get the gas to the Kensington plant.
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com