I just noticed this a few days ago and thought I'd post it since this will affect everything that is currently being done in our County by CHK. Another step up the ladder to production for more wells.
Utica Gas Services finally received permits for this facility that includes 3 dehydration units, the smallest of which I believe is the one running there now. Link: http://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleAuth.aspx?A...
This will allow them to process a large quantity of produced gas once they hook up the gathering lines being installed or to be installed this year.
Tags:
Update:
I just took a walk around the Thompson site. They have added and are still adding a large amount of gas production related equipment for the new incoming gathering lines as they connect up more wells this year.
They have also made a new tap into the 30" Dominion Transmission line using what appears to be a 10" or 12" connection. A lot of gas can go through a line of that size. Currently they are using a 4" connection to the same 30" line to sell through.
The first of at least 2 more new heater treaters and all the related equipment is being assembled and installed. It is at least 4 times the size of the current one they are using, which conforms to the sizes that are permitted.
With 3 or more gathering lines or extensions being added this year they will be bringing at least 6 well sites online.
As I've been saying, 2014 is going to be the year that puts Beaver County on the map!
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com