I was wondering how long does the site work take to bring a rig in and how long does the drilling usualy take
Tags:
OG,
3 - 4 weeks for site work
3 - 4 weeks for Vertical Drilling
3 - 4 weeks for Horizontal Drilling
3 - 4 weeks to Frack
Jeff replied to Petroleum Attorney 1976's discussion 'FYI- Mineral Owners in the State of Ohio (Utica Shale area's)'
© 2026 Created by Keith Mauck (Site Publisher).
Powered by
| h2 | h2 | h2 |
|---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com