I've been waiting a long time with no new information. Last told by Chesapeake that they are waiting for the well to be hooked up to the pipeline. Have been told that for over a year now. Does anyone have any new info about a timeline or why this is taking so long?
Tags:
I spoke to Chesapeake the other day about the CTG well on Old Blackhawk Road. They basically told me the same thing, that the gathering lines weren't in place and that the well was ready for production, gee, like I didn't already know that.
tt has been a long time coming.
Thanks Jack for the info. Keep up the good work and let us know if you find out anything else
jack when the lines reach the wells does that mean we are in the supply chain or do we have to wait till they reach their final destination before they can produce.
Yep, that is where it will go. There is a Dominion transmission line they sell to that is 30" and is within 100 yards of the Lime Kiln processing site.
My wife called chesepeake today they told her Cody was scheduled to be fracked on the 24th sept and that we should be seeing some money by the first or second quarter of next year. I remember seeing the well had a spud date a long time back.I thought that meant it it had already been fracked. Guess i was wrong. Good news though.
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com