Anyone know what the rotary rig was drilling for on the ROW on Fredericktown Road on Monday and Tuesday?
Tags:
NORTH BEAVER PIPELINE PHASE 2 ESGP-2 | |
Client: | UTICA GAS SVCS LLC |
Authorization type: | Erosion and Sediment Control GP-2 |
Application type: | New |
Authorization is for: | SITE |
Date received: | 04/19/2013 |
Status: | Issued on 9/25/2013 |
Hi Larry
Not sure exactly where you are talking about ? Deemston on Ridgewood dr?
only says South Beaver Twp. Nothing more specific on the site.
http://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?S...
Ok, so this pipeline is only going to South Beaver TWP?
NOT Southern Beaver County, Correct?
From the minutes of Beaver County Planning Commission
South Beaver Twp – Utica Gas Services. LLC (UGS) (2) 1) Permit for North Beaver Pipeline, Phase 2 (installing a 12 inch natural gas pipeline, 2 six inch well connect lines & associated access roads.) 2) Permit for Rolling Acres Gathering Line and Maga Well Connect Pipeline (installing a 10 inch natural gas pipeline and 6 inch national gas pipeline).
North Beaver Pipeline Project – Appalachia Midstream Services, LLC
Act 14 notice: installation of approx. 4.2 miles of 10” natural gas gathering pipeline
from 3 natural gas wells to a compressor station along an existing transmission pipeline
That is all the information I can find at the moment.
Thanks for the info larry. I'll see if I can get anymore info from the twp folks.
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com