Seems like the last couple of years several bridges have been replaced or repaired. Right not the bridge west of Knoxville is in the process of some sort of repair work. Route 249 has had bridge work done and it looks as if another smaller bridge is to be upgraded at Phillips station. Several miles south on 249 repaving is being or has been done on a section.
Westfield has had major paving patches several inches deep right through town and new blacktop was applied westward from the Big M bridge.
And now next week Broughton Hollow road is to be repaved at least in part. I presume in preparation for the heavy truck traffic expected in coming weeks.
Bill L.
Tags:
© 2025 Created by Keith Mauck (Site Publisher).
Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com