The well that Travis Peake is looking to drill is for the Attica about 11,000 ft. below the surface according to information I have.
The bore will run more or less parallel to Broughton hollow road to route 49 and end just east of Brace hollow road. It is expected to penetrate the Trenton/Black river.
Tags:
Our road is to be beefed up in about a week to handle the heavy traffic. I think two years ago the entire length from route 49 to the bottom of Baker Hill was paved over. It was all dug up and a new surface applied. There are only one or two potholes that are really needing attention. But I understand that due to the heavy truck traffic soon to come that suspected weak areas over sluice pipes and a few other spots will be repaved. Anyway a notice was sent to us that at least two days will be required to cover the two miles to the well entrance from Broughton Hollow road.
Bill
I mistyped the name of the shale deposit. It should read UTICA and not Attica. Sorry about that
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com