I honestly don't know what kind of rig was supposed to come but I guess it didn't make it yet. I was told that there was some kind of ativity the week before last where they were installing the outer casing. I guess they drill down through this outer casing. It sounds like it won't be long now.
There are about 5 steps that involve casings before fracing will begin. The first casing is usually driven about 40 feet into the ground. the next casing is drilled through the ground water layer and cement back to ground surface before any frac water is even entered into the ground. It sounds like the contracted piledriving rig is in place now, they will be quickly followed by the vert rig
They have been bringing equipment through alliance on st rt 183 to state street and then out to knox school road to get to Georgetown road . As of like 8:30 this am when I drove by it looked like the platform was up and the are making a lot of progress on the rig assembly. They had two large cranes on site.
I went by the well site tonight and the rig appears to up and is all lit up so it looks like they are rolling right along.
According to ODNR web page this well has been drilled. Has anyone heard any results?
They just delivered 6 storage tanks to the Sanor well for oil storage ect.
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com