Updated November 8, 2011
This webpage is a little over a year old. During this time frame oil and gas leasing
offers have increased significantly.
As of November 8, 2011 the signing bonus has increased to $5350-$5800 with the royalty percentage at 20 % gross. Leases are being signed by several companies. The best lease terms are being realized by the landowner groups that offer their acreage through a competitive bidding process. I personally believe the money offers will continue to increase with time. The highest offers occur when landowners pool their land into contiguous units.
Presumably, all are aware that Chesapeake recently leveraged 25% of their leaseholds in
Eastern Ohio for $15,000 per acre by forming a JV with an undisclosed oil major.
Tags:
I saw it yesterday, and it sure is a site to behold.
Here's all the pipe they are going to use to connect over to the well head.
Will the fluid traveling that distance be just raw water, or will it be the the actual frac fluid? I'm wondering about the danger if that line would rupture and send all that fluid down the valley and right into the Harrison Forest campground...
Thanks Nate, that makes sense. It is so great to have your brain on this forum! While I do...
So then once they have injected all that water down there, and it has worked its fracing wonders, then what happens with all that water? Doesn't some/most of it get pumped back out and hauled away? At that point will they pump it back through those lines and fill back up those tankers so they can go to some disposal facility?
Dan,
The slickwater (frac fluid) will return to the surface during flowback. Usually the flowback water is trucked directly from the well site to a disposal facility, however if the well site is not readily accessible to truck traffic it may be piped back to the tanks, then hauled off. It will require ~7-8 million gallons of water for the fracture process.
That makes sense. In that case they would definitely be cycling the fluid back into the tankers though, right, because they have to store it somewhere?
I guess my question overall is what is the protocol for spills, and the preventative measures taken to mitigate damage caused by a spill. I can see how the compartmentalizing of the fluid across 30 trucks has the effect of controlling any spills, because they probably have it set up so that at the most only one tanker full of fluid could escape before they shut down the system.
Thanks FXEF,
I'm mildly worried about the handling of frac fluid (as opposed to it's actual use, which I have no problem with), and I know that the handling of it is becoming a topic of great concern with ODNR and with environmentally-minded folks. It just strikes me that there is a BIG difference in terms of monitoring, protection, exposure, and potential liability between having the fracing operation self-contained within the well-pad site versus having to lay a pipe a half a mile through a wooded valley to reach the well site. If it was only raw water it would only be a liability of washout/erosion/flooding if the pipe bursts open and a couple million gallons of water goes rushing away. If however, they are going to be pushing the water with those frac additives in it back through that line, then it seems to be a liability on a whole higher level, and I would think that the ODNR should be very restrictive about allowing it. I assume they got some kind of approval for this alternate kind of setup, and maybe it will only be the raw water passing one way through the pipes, but it just gives me pause when I consider it. Does anyone have more insight into this?
© 2025 Created by Keith Mauck (Site Publisher).
Powered by
h2 | h2 | h2 |
---|---|---|
AboutWhat makes this site so great? Well, I think it's the fact that, quite frankly, we all have a lot at stake in this thing they call shale. But beyond that, this site is made up of individuals who have worked hard for that little yard we call home. Or, that farm on which blood, sweat and tears have fallen. [ Read More ] |
Links |
Copyright © 2017 GoMarcellusShale.com