Kinsey Well(Tippecanoe), E Clark well (Freeport), Chevron Harrison County

Any information on these wells? Kinsey has been in production for awhile now but cannot find any production nu bers. Also, the platt map for E Clark has 10 proposed well heads on the drawing. is that possible, would they put 10 legs. Any information on either of these wells would be great

Views: 3245

Reply to This

Replies to This Discussion

you wont likely see production numbers until mid april next year when the DNR puts them out............and yes, 10 wells is very possible.....some operators are spacing wells closer together and using different completion techniques in hopes of getting more production from the acres........also this area could be very good as surrounding wells have been very good.

Good luck Brian, hope you get in, things will really heat up when McClendon kicks this into high gear... with Shell, Enervest and Red Hill, he really has some impressive acreage.

Guess I missed it, but just asking how McClendon has ties with Red Hill?

I was looking at the ODNR docs on the Chevron Kinsey wells. They have some IP numbers in the documents. The Kinsey 1-24HD has showing 1332 MCF of gas, 446 BO, and 191 BW. The 2-24 HD shows 1612 MCF, 429 BO, and 182 BW.

http://www2.dnr.state.oh.us/Website/DOG/WellSummaryCard.asp?api=340...

http://www2.dnr.state.oh.us/Website/DOG/WellSummaryCard.asp?api=340...

How do you get to these well cards?

Brian.....

 

1 way is to use this link   http://www2.dnr.state.oh.us/website/dog/oilgasviewer/index.html

 

Zoom into an area of interest......hit the "i" icon   to identify features..... select the well of interest....and it will provide a link to the  "well Summary report link"

 

At the bottom of the Well Summary....there will be links to available documents

 

 

The Ohio ODNR Gas Well Viewer map located here.

http://www2.dnr.state.oh.us/website/dog/oilgasviewer/index.html

Yes there are 10 proposed Chevron wells on the E.Clark pad.  Only 2 verticals have been drilled so far.  Horizontal rig is to be moved in very soon (supposed to be Jan1-Jan15), as soon as it's taken down from the pad around st rt 250 and 800.  From what they said, they'll drill these 2 horizontals and then move to another location and do the research on what's producing on the first 2 before coming back or sending in another rig to finish the other "8" wells.  If you want to believe what the land guys tell you, they should be back in 2-3 years to finish the other wells.  I think they change their mind every day or thier higher ups change their minds and the answers are always different.

Watch your paperwork and write down what their landmen tell you so you can remind them of what they said and promised.

RSS

© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service